<u id="9zezq"><form id="9zezq"></form></u>

      <blockquote id="9zezq"></blockquote>
    1. 亚洲色涩,亚洲丝袜熟女,多人乱p视频在线免费观看,国产制服丝袜在线播放,亚洲成人黄色网,国产天天操,97无码国产精品久久久日本,亚洲自拍中文

      Regenerative preheating furnace system

      In the alkylation spent acid regeneration process, SO2 needs to be mixed with preheated hot air and then enters the SO2 converter to be converted into SO3 under the action of a catalyst. The preheating of the process air is to maintain the ideal temperature of the catalyst bed and to ensure that the SO2 conversion rate is greater than 99.9%.

      Instruction

      The regenerative preheating furnace is equipped with an air fan, and high-temperature combustion is carried out through a customized burner, so that stable high-temperature flue gas enters the air heat exchanger, and finally high-temperature air is obtained. A circulating flue gas channel is arranged between the flue gas outlet at the tail of the heat exchanger and the combustion furnace, and part of the low-temperature flue gas discharged from the flue gas outlet at the tail of the heat exchanger is sent into the furnace through a recirculation fan and mixed with the combustion flue gas , By adjusting the circulating flue gas volume, the stability of flue gas temperature at the outlet of the furnace can be ensured.

      Project performance

      Jiangsu Sierbang Petrochemical Co., Ltd.
      Process air preheating system for SAR unit of acrylonitrile expansion technology transformation project

      Zhejiang Petrochemical Co., Ltd.
      40 million tons/year refining and chemical integration project Phase I project 260,000 tons/year, Phase II project 360,000 tons/year sulfuric acid plant process air preheating system project

      CNPC Jilin Petrochemical Branch
      Sulfur-containing wastewater sulphuric acid project air heating furnace